i'm preparing a survey methodology in tunnel survey from surface to underground
can somebody help me i got no idea on under ground procedure..
it's a horse shoe shape tunnel and the method to be used is drill and blast using tomrock drills with 3 arm or drill..about 7 km.
Replies
sorry i have no pictures only typical section and profile...