I don't even no where to begin... I am involved with a group that is in Ethiopia and the want to set geodetic control.  They have access to a trimble R8-2 and TSC1.  What is the process like...I mean I understand the post processing in the States, but I have no idea what the process is outside of the USA.

Anyone?

You need to be a member of Land Surveyors United - Surveying Education Community to add thoughts!

Join Land Surveyors United - Surveying Education Community

Email me when people reply –

Replies

  • Great help from all...thank you for the guidance and feedback.
  • Dear Sir,

    It’s my pleasure to send my suggestion on basic geodetic reference control point input for geodetic/supplementary survey works in Ethiopia.

    You can get CORS, Zero Order, 1st order etc basic control points data either from shelf, depending on your project location, or you can get service to establish (GPS surveyed and processed) for a particular project from Ethiopian Mapping Agency, the only national mandated organization to make, archive, manage, administer, disseminate, regulate and assure quality of geo-spatial information (fundamental geo-spatial data set) throughout Ethiopia.   

    With Best Regards

    Girma Habtegiorgis

    • If any addtional question please do ot hesitate.

  • Land Surveyor

    You need reference (base) GPS data from a known point. If there is no control points with known coordinates, you can try to use either the NGS's OPUS service or the Australian AusPos.

    In this case you need to collect enough raw data on the point you have to use. Enough means several hours, because NGS and AusPos will search for the nearby known GPS base stations, but sometimes the closest is 500-1000 km far from your point. The longest your data is the best chance to get fix position from the mentioned services. 4 hours was enough for me to calculate a vector from Hongkong to Hanoi (800 km), but 12 hours was not enough from Bahrain to Tehran (1100 km)

    The logging rate must be about 1 per minute, or 1 per 3 minute if you want to use these external services.

    If you can find base stations closer to your point, and you are processing the data with your own sw. such as Trimble TBC, you need to log raw GPS data at the same rate which the Reference stations are using (1/sec..1/15sec, etc), and the length of your data may be shorter (30 minutes if the base is 10-20km far from you, 1 hour if the base is 30-50 km, etc.)

  • Land Surveyor

    This has some useful info. Might be the place to start.

    https://www.ngs.noaa.gov/INFO/Policy/files/052013_International_OPU...

    https://www.ngs.noaa.gov/INFO/Policy/files/052013_International_OPUS-GNSS_Policy.pdf
This reply was deleted.

Answer As your Facebook Page

Global Surveyor Forum

Latest Discussions by Category

Add Your Expertise

How to Utilize Surveyor Forums

How to use Forums
Our forums on Land Surveyors United are here to be used as much for finding help with problems in the field as the are for you to express your opinions on anything that has to do with land surveying in general. Feel free to share anything that is on your mind, as long as it isn't meant to damage another member's reputation. Please keep it clean and help insure that everyone has the opportunity to enjoy the benefits of being part of a community that grows together.

We are committed to allowing freedom of expression for all of our members, and that includes maintaining a safe space for people with opposing views to express themselves. We get posts from all over the country and even the globe, so needless to say, people come with different viewpoints on lad surveying practices and processes. We see this diversity and variety as a real strength-- dialogue and debate are an integral part of the educational process, as well as an important tool in exploring different sides of complex issues.

All Community Hubs inside the community have their own forum for asking specific questions to other surveyors, by location, equipment type, etc.

Global Forums

Blog Topics by Tags

Monthly Archives