I am looking for some advice on setting control for a multi-span bridge. There is almost 2 miles between each abutment. There is random traverse control set throughout the job that was set by others. We have a gps calibration that was perfromed a few months ago, from a permanent base station that was set on the roof of a building on site. We are hitting most of the control on the job within .05' or so.from one end to the other. I am just a little unclear on how to proceed as far setting all the control for the construction of the more than 50 piers on the job. We are not tieing in to any existing bridges, it is on a new alignment, and the abutments are all new as well. The bridge is to be constructed in stages, so the only thing I really have to tie in to is the stage line, to make sure we are not encroaching on the existing bridge during the first phase. 

I was thinking of setting three GPS pairs, a pair at each end of the site, and one in the middle. Running a traverse through all of them, adjusting accordingly if needed, and then laying out all of the pier offsets from the main traverse. I have never done a bridge this long, so I want to cover all bases before proceeding.

Any thoughts or advice would be greatly appreciated.

You need to be a member of Land Surveyors United - Surveying Education Community to add thoughts!

Join Land Surveyors United - Surveying Education Community

Email me when people reply –

Replies

  • Hi Matt, 

    These days I am also doing bridge setting out so i am very interesting about this subject.but fortunately there are small ones not like your bridge.

    As for as controls I don't see any errors your suggested method because those points are from primary control network.Length of the bridge doesn't matter as long as we are using primary control points.

    Chamara

This reply was deleted.

Answer As your Facebook Page

Global Surveyor Forum

Latest Discussions by Category

Add Your Expertise

How to Utilize Surveyor Forums

How to use Forums
Our forums on Land Surveyors United are here to be used as much for finding help with problems in the field as the are for you to express your opinions on anything that has to do with land surveying in general. Feel free to share anything that is on your mind, as long as it isn't meant to damage another member's reputation. Please keep it clean and help insure that everyone has the opportunity to enjoy the benefits of being part of a community that grows together.

We are committed to allowing freedom of expression for all of our members, and that includes maintaining a safe space for people with opposing views to express themselves. We get posts from all over the country and even the globe, so needless to say, people come with different viewpoints on lad surveying practices and processes. We see this diversity and variety as a real strength-- dialogue and debate are an integral part of the educational process, as well as an important tool in exploring different sides of complex issues.

All Community Hubs inside the community have their own forum for asking specific questions to other surveyors, by location, equipment type, etc.

Global Forums

Blog Topics by Tags

Monthly Archives