2 or 3 back sights for Free Station (resection)?

Following examples are calculated with BestNetwork.

Free Station is also known as Resection. Get Location of the total station by measuring distance and angles to known points (back sights).

 

Free Station with 2 known points (back sights): 

- 1 new point (station) with unknown coordinates are marked in red (point 3). 

- Existing points with known coordinates are marked in green (points 1, 2).

- Station on point 3 with observations (orange lines) to point 2 and 3

 

Free Station with 3 known points (back sights): 

- 1 new point (station) with unknown coordinates are marked in red (point 3). 

- Existing points with known coordinates are marked in green (points 1, 2 and 4).

- Station on point 3 with observations (orange lines) to point 2, 3 and 4


Example Free Station with 2 back sights

Accuracy (blue error ellipse in map):

Standard deviation is 3.5 mm. (notice that standard deviation of known points is set to 5 mm)

Reliability:

The report shows that the coordinates of point number 3 are not reliable. A false observation from station or a false coordinate of the reference points can cause an infinite wrong position of point 3 (999999 = infinite)

Example Free Station with 3 back sights

Accuracy (blue error ellipse in map):

Standard deviation is 3 mm. There is not a very big improvement of accuracy if you are using 3 known points to set up your station.

Reliability (yellow lines):

The report shows that the coordinates of point number 3 are now reliable. A false observation from station to point number 2 can cause an wrong position of point 3 of  4 cm.

Votes: 0
E-mail me when people leave their comments –

You need to be a member of Land Surveyors United - Surveying Education Community to add thoughts!

Join Land Surveyors United - Surveying Education Community

Thoughts

  • 1201271852?profile=original?width=750

    Hi I have computed a resection from 3 points with 2mm(X), 0.8mm(Y), 1.2mm(Z). The height of the computed points is perfect but as you can see in the highlighted image all of them are rotated. Any thoughts of how can I avoid these things to happen in the future or maybe which may be the possible source of errors in this case?. I had the resection points placed in 3 quadrants so the geometry was as good as it gets, the distances were about 40m for the first resection points, about 20m for the second one and about 28 for the third one. Thanks

  • In concluson this example shows that regarding to standard deviation it does not matter if someone just measure to back sights. As long that this two points are good dustributed (gemetrically).

    However with only two backsights it is impossible to detect a false coordinate. This is the dangerous part of just 2 backsights and the main reason that it is often recommended that free station must have at least 3 backsights.

    It does not matter what software is used to calculate this. I do not know dc-surveys-software. Thank you for this input. I will try that one
  • Greetings,

    I am not seeing all the pieces to your puzzle. You reference calculated with BestNetwork.?

    I would be interested in your response comparing what you have as a result and using several methods available in DC_Survey software.  Try the free version download from

    www.dc-survey-software.com

    Let me know.

    Marcus

    [email protected]

This reply was deleted.

Log into community to no longer see ads

Land Surveying Guides

Our Blog Sitemap

 
 

Explore Surveying Locally

USA Surveying Forums
Asia Surveying Forums
Africa Surveying Forums
Middle East Surveying Forums
European Surveying Forums
South American Surveying Forums
Oceania Surveying Forums
Surveying Equipment Support Forums
Search Survey Photos
Add Posts, Surveying Photos, Videos and Articles to the Surveyor Community
Add Stuff to Community

 


 
 
 

 

 

Latest in Surveyor Community

Week 142: Key Strategies for a Successful Land Surveying Business via GeoRadio- All Land Surveyor Podcasts in One
52 views 8 likes

Channel: Trent Keenan

In this presentation, Trent Keenan, PLS and owner of Diamondback…
8 hours ago
Luke Ritz is now a member of Land Surveyors United - Surveying Education Community
13 hours ago
SAMUEL OKONKWO updated their profile photo
18 hours ago
SAMUEL OKONKWO updated their profile photo
18 hours ago
Allan Archbold posted a discussion in Leica Support Group
has anyone successfully loaded a current almanac onto a Leica GX1230 receiver. I have tried to force it to initilise via Config - satttelited - Shift F4 but no luck.
Saturday
Konstantinos Manolesakis is now a member of Land Surveyors United - Surveying Education Community
Friday
The surveyor hub for Safety Apparel was featured
Jan 8
The surveyor hub for Safety Apparel was featured
Jan 8
More…