Not a Surveyor
This Week in History: Building The Brooklyn Bridge: Bridging Cities and Innovating Surveying Practices

Building the Brooklyn Bridge: Bridging Cities and Innovating Surveying Practices12557066484?profile=RESIZE_710x

On May 24, 1883, the Brooklyn Bridge gracefully arched over the East River to connect Manhattan and Brooklyn, forever transforming the urban landscape of New York City. Celebrated as an engineering marvel, the Brooklyn Bridge stood as the largest suspension bridge of its era. It not only connected two bustling boroughs but also symbolized the union of traditional craftsmanship and emergent technologies of the late 19th century. The design, envisioned by John A. Roebling and brought to fruition by his son, Washington Roebling, showcased not only the possibilities of steel as a structural material but also the indispensable role of land surveying in constructing such vast infrastructures. This monumental achievement highlighted how advanced surveying techniques were critical to addressing the unique challenges posed by the bridge's design and location.

The successful completion of the Brooklyn Bridge was not merely a testament to human perseverance and engineering prowess; it also illustrated the evolution and significance of surveying techniques that were crucial in overcoming the geographical and logistical challenges of such a colossal undertaking. This essay delves into how surveying practices of the late 19th century played a pivotal role in the bridge's construction, influencing its design, execution, and long-lasting success.

Historical Context and Surveying Significance

The Brooklyn Bridge project commenced at a time when urban America was undergoing rapid transformation. Cities were burgeoning, and the need for efficient transportation networks was becoming increasingly apparent. The idea of a bridge connecting Manhattan to Brooklyn was envisioned as a solution to the severe congestion in existing ferry routes across the East River, a natural obstacle that hindered the flow of people and goods between these critical economic zones.

Surveying, a field that had evolved significantly since its rudimentary applications in ancient civilizations, was at the forefront of this architectural endeavor. The late 19th century was a period marked by significant advancements in surveying instruments and methodologies, transitioning from simple tools to more sophisticated equipment capable of providing the precision required for such ambitious projects.

12557106660?profile=RESIZE_710xThe Role of Surveying in the Brooklyn Bridge's Construction

From the outset, the construction of the Brooklyn Bridge posed unique challenges that demanded unparalleled precision in surveying. The East River's strong currents, deep waters, and busy maritime traffic required a thorough understanding of the underwater topography and precise placement of caissonsโ€”large, watertight chambers where workers could dig foundations safely below the waterline.

  1. Underwater Surveying Techniques: The project's success was heavily reliant on accurate underwater surveys. Advanced diving bells and rudimentary sonar technology were employed to map the riverbed, ensuring the caissons were positioned on solid ground to support the enormous weight of the bridge structures.
  2. Geometric Challenges: The design of the bridge required meticulous geometric calculations. Surveyors used theodolites, devices that could measure horizontal and vertical angles with high accuracy, to ensure the towers were perfectly aligned across the vast expanse of the river. This alignment was crucial not only for the bridge's structural integrity but also for its aesthetic symmetry.
  3. Material Handling and Placement Accuracy: The positioning of cables, particularly the four massive main cables made of steel wire, relied on precise surveying to ensure that each cable was correctly tensioned and anchored. The surveyors' ability to accurately measure distances and angles ensured that the loads were distributed evenly, preventing undue stress on any part of the structure.

Innovations Brought About by Necessity12557110267?profile=RESIZE_710x

The Brooklyn Bridgeโ€™s construction spurred innovations in surveying techniques, which had to adapt to the unique demands of the project. These innovations included the development of new surveying instruments and the refinement of existing methodologies to increase their accuracy and reliability. For instance, the integration of more durable materials into surveying tools reduced wear and tear, maintaining their precision over the lengthy construction period.

As the Brooklyn Bridge celebrated its grand opening in 1883, it stood as a monumental achievement not only in engineering and architecture but also in the field of surveying. The bridgeโ€™s construction underscored the critical role of advanced surveying techniques, which enabled surveyors to overcome significant natural and logistical challenges. The successful application of these techniques ensured the bridgeโ€™s structural integrity and enduring legacy as one of the great architectural wonders of the modern world. This narrative not only commemorates the achievements of those who built the Brooklyn Bridge but also serves as an enduring testament to the evolution of surveying as an indispensable element of civil engineering and architectural success.

Part I: Contextual Background and Design of the Brooklyn Bridge12557120873?profile=RESIZE_710x

Historical and Urban Significance

Before the monumental construction of the Brooklyn Bridge, the bustling populations of Manhattan and Brooklyn had only the East River ferries for inter-borough transit. These ferries, while functional, were susceptible to the whims of weather and the river's often treacherous currents, constraining economic and social interactions between the two burgeoning urban areas. The completion of the Brooklyn Bridge radically transformed these dynamics, providing a stable, reliable means of crossing that bolstered both daily commuting and broader economic exchanges. This infrastructural leap facilitated a closer integration of Brooklyn into the socio-economic fabric of New York City, signaling a new era of urban connectivity.

The architectural and engineering prowess displayed in the Brooklyn Bridgeโ€™s design not only served practical purposes but also stood as a beacon of aesthetic and technological advancement. Featuring the worldโ€™s first steel-wire suspension system, the bridge was a marvel that stretched over 1,595 feet of open water, supported by Gothic Revival towers that soared to new heights with their characteristic pointed arches. This design not only ensured robust structural integrity but also imbued the cityโ€™s skyline with a dramatic and enduring icon.

12557121871?profile=RESIZE_710xJohn A. Roebling and Innovations in Engineering

John A. Roebling, the visionary behind the Brooklyn Bridge, brought a unique design philosophy that merged functionality with grandeur. Roebling, who had already established a reputation with successful bridge projects utilizing suspension technology, saw the potential for such designs to transform urban landscapes. His approach to the Brooklyn Bridge was no different; he envisioned a structure that would be both a critical transportation link and a lasting symbol of architectural beauty.

The technological innovations introduced during the bridge's construction were revolutionary at the time and pivotal to its success. Roeblingโ€™s use of steel wire in the bridgeโ€™s cables was a significant departure from the iron chains traditionally used in suspension bridges, offering enhanced strength and durability. This choice reflected a forward-thinking embrace of emerging materials technology that would set new standards for future projects.

Moreover, the implementation of pneumatic caissons for the construction of the bridgeโ€™s towers represented another groundbreaking aspect of the project. These watertight chambers, sunk to the riverbed, allowed workers to excavate for tower foundations even under the river's challenging conditions. The caissons were filled with compressed air to keep water and mud at bay while crews worked below the river's surface, a method that had never before been employed on such a large scale.

Surveying's Critical Role in Realizing Roeblingโ€™s Vision12557129885?profile=RESIZE_710x

The ambitious design and engineering feats achieved with the Brooklyn Bridge would not have been possible without the sophisticated surveying techniques of the era. Surveyors faced the colossal task of translating Roeblingโ€™s bold designs into precise physical realities, a challenge that involved meticulous planning and execution. The accuracy required to align the massive towers and ensure the proper tensioning of the steel cables demanded a level of precision that only the most advanced surveying methods of the time could provide.

The role of surveyors in the project extended beyond mere measurement. They were integral in navigating the myriad challenges posed by the East River's geographyโ€”its depth variations, tidal currents, and busy maritime traffic all presented significant obstacles that required innovative surveying solutions. For instance, the precise placement of pneumatic caissons was critical to the stability of the entire structure. Surveyors used theodolites and leveling instruments to ensure that these foundational elements were perfectly aligned according to Roeblingโ€™s specifications.

In essence, the construction of the Brooklyn Bridge was as much a triumph of surveying as it was of engineering and architecture. The surveyors of the project did not merely measure; they turned visionary designs into tangible structures. Their work ensured that the Brooklyn Bridge would not only stand as a functional crossway but also as a testament to the potential of human ingenuity when paired with precision and determination. As such, the bridge remains a symbol of the critical role that surveying plays in shaping our built environment, bridging the gap between innovative architectural vision and the grounded realities of structural engineering.

12557121893?profile=RESIZE_710xPart II: Surveying Techniques and Their Applications

The construction of the Brooklyn Bridge, a marvel of 19th-century engineering, required overcoming significant geographical and technical challenges. Central to this endeavor was the expert application of surveying techniques that allowed engineers to navigate and manage the difficult conditions posed by the East River. This part of the essay explores how surveying was instrumental in addressing these challenges during the construction of the bridge.

Surveying the East River

The East River, a saltwater tidal strait, presented a series of significant obstacles for the construction of the Brooklyn Bridge. With busy maritime traffic, varied depths, and strong tidal currents, the river environment demanded precise and careful surveying to ensure the feasibility and safety of the bridge's construction.

Challenges of the Terrain and Location:

The dynamic nature of the East River meant that surveyors needed to account for factors such as water depth fluctuations and rapid currents which could impact structural placements and long-term stability. The river's busy traffic also required that surveying work be coordinated around the schedules of other maritime activities to prevent disruptions and ensure safety.

Use of Precise Instruments:

To tackle these challenges, surveyors employed a range of sophisticated instruments:

  • Theodolites: These were crucial for precise angular measurements, allowing surveyors to ensure that components of the bridge were aligned correctly across the wide expanse of the river.
  • Leveling Instruments: These tools helped determine vertical accuracy essential for the engineering of the bridgeโ€™s towers and ensuring they were perfectly vertical.
  • Chains: Used for precise distance measurements, chains helped in laying out the distances needed for accurately placing the towers and anchorages relative to each other.

These instruments allowed surveyors to create a highly accurate topographical map of the riverbed and surrounding areas, which was critical for all subsequent construction phases.

Role of Surveying in Construction

The surveyorsโ€™ ability to provide precise measurements and continuous monitoring was vital not only in the initial phases but throughout the construction process. They ensured that each stage of construction adhered strictly to the planned designs, maintaining the structural integrity and aesthetic symmetry of the bridge.

Alignment and Symmetry:

Maintaining the bridge's alignment and symmetry was particularly challenging given its scale and the innovative design elements involved. Surveyors continually checked and rechecked measurements as construction progressed, adjusting calculations as needed to adapt to the physical realities encountered at the site. This rigorous process was essential to prevent any misalignment that could compromise the bridgeโ€™s structural integrity and visual impact.

Monitoring Structural Integrity:12557143488?profile=RESIZE_180x180

Perhaps one of the most critical roles of surveyors was the ongoing monitoring of the bridge's foundational structures, especially the pneumatic caissons. These large, air-tight chambers were sunk deep into the riverbed to allow for the construction of the bridge's towers:

  • Settlement Monitoring: Surveyors regularly measured the settlement of these caissons into the riverbed. This was crucial as any uneven settling could lead to future structural issues.
  • Shifting Monitoring: The riverbedโ€™s composition and the strong tidal currents could cause shifting of these foundational elements. Surveyors used their instruments to detect even slight movements, ensuring that any potential problems could be addressed promptly.

The continuous data provided by surveyors enabled engineers to make informed decisions quickly and adjust construction strategies as necessary. This adaptability was crucial for managing the unpredictable conditions under which the Brooklyn Bridge was built.

The role of surveying in the construction of the Brooklyn Bridge cannot be overstated. Through the use of precise instruments and continuous monitoring, surveyors overcame the natural and logistical challenges posed by the East River, ensuring the alignment, symmetry, and structural integrity of this iconic structure. Their work not only facilitated the successful completion of the bridge but also set standards in surveying practices that influenced future projects across the globe. The Brooklyn Bridge stands as a testament to the critical role of surveyors in bridging the gap between visionary design and practical engineering reality, marking a significant chapter in the history of civil engineering.

Part III: Construction Challenges and Surveying Solutions12557121285?profile=RESIZE_710x

Constructing the Brooklyn Bridge presented a myriad of engineering challenges that required not just innovative solutions but also meticulous surveying practices to ensure that each phase of the construction was completed successfully. Central to this process were the implementation and monitoring of pneumatic caissons for the foundations and the precision in cable-spinning and load distributionโ€”all of which heavily relied on the precision and adaptability of surveying techniques of the time.

Construction of Pneumatic Caissons

The foundation of any bridge is critical to its overall stability and longevity, and for the Brooklyn Bridge, this foundation was particularly challenging due to the East River's environment. The solution came in the form of pneumatic caissons, which were revolutionary at the time of the bridge's construction.

Innovative Foundations:

Pneumatic caissons are large, airtight boxes that provide a dry working environment for workers to lay a bridge's foundations. For the Brooklyn Bridge, these were essential due to the river's depth and the soft, muddy riverbed. The caissons were sunk to the riverbed and filled with compressed air to keep water and mud out, allowing workers to excavate the riverbed within them.

Surveying in Confined, Artificial Environments:

Surveying within these pneumatic caissons required unparalleled precision. The surveyors had to ensure that the caissons were placed accurately according to the architectural plans. This involved rigorous checking and re-checking of alignments and levels from within these confined spaces, where traditional surveying methods were often challenged by limited visibility and space.

Surveying Underwater:

The introduction of surveying in such underwater, high-pressure environments brought about significant innovations in surveying techniques. The accuracy needed for placing these caissons under the river was critical, as any errors could jeopardize the entire project. Surveyors adapted their techniques to these conditions, developing methods to deliver precise readings despite the poor visibility and the challenging conditions that also affected the workers' health, known later as "the bends."

12557174272?profile=RESIZE_710xCable-Spinning and Load Distribution

Once the foundations were set, the construction of the Brooklyn Bridge's superstructure began, which involved the complex process of spinning the main cables and distributing loads across the bridge.

Ensuring Tension Accuracy:

The main cables, made from vast quantities of steel wire, are fundamental to the suspension bridge's structure. Ensuring that these cables were correctly tensioned was crucial for the bridge's integrity. Surveyors played a pivotal role in this phase by using tension gauges and other precise instruments to continuously monitor and adjust the tension of the cables during the spinning process. This ensured that the cables would bear the bridge's weight as designed.

Load Assessments:

Equally important was the accurate assessment of load distribution, particularly for the anchorages that bear the lateral tensions of the cables. Surveyors needed to calculate and recalibrate load distributions throughout the construction process to ensure that the forces were balanced correctly across the bridgeโ€™s structure. These calculations were vital not only during the construction but also for the long-term stability of the bridge, ensuring that undue stress did not accumulate at any point.

The surveying work during the construction of the Brooklyn Bridge was characterized by a series of innovations necessitated by the unique challenges of the project. The surveyorsโ€™ ability to adapt and apply precise measurements in dynamic, often adverse conditions was crucial to the project's success. Their work ensured that from the foundational caissons to the iconic steel cables, every component of the Brooklyn Bridge was accurately placed, tensioned, and balanced. This not only facilitated the successful completion of one of the most iconic landmarks in New York City but also pushed the boundaries of what was possible in civil engineering and surveying at the time. The legacy of these surveying achievements continues to influence modern engineering projects, emphasizing the critical role of precision and innovation in surveying in overcoming construction challenges.

Part IV: Legacy and Impact of Surveying on the Brooklyn Bridge12557185853?profile=RESIZE_710x

The construction of the Brooklyn Bridge not only marked a monumental achievement in civil engineering and urban development but also set new benchmarks in the field of surveying. The innovative practices and technologies developed through this project had lasting impacts, influencing future surveying techniques and the broader scope of urban infrastructure projects.

Enhancements in Surveying Practice

Advancements in Instrumentation:

The immense scale and complexity of the Brooklyn Bridge project demanded unprecedented precision in measurement and placement, which spurred significant advancements in surveying instruments. The use of theodolites, crucial for angular measurements, saw notable improvements in accuracy and durability. These enhancements allowed for more reliable data collection in challenging construction conditions, setting a new standard for engineering projects. Similarly, leveling devices were developed to be more robust, capable of delivering precise readings amidst the bustling, uneven construction site of a major suspension bridge. These advancements not only improved the efficiency and accuracy of surveying work but also reduced the likelihood of costly errors in large-scale projects.

Professional Development:

The surveying challenges presented by the Brooklyn Bridge project provided a unique professional development opportunity for surveyors. Working on such a pioneering project helped elevate the status of surveyors within the field of civil engineering. The successful integration of advanced surveying techniques highlighted the critical role of surveyors in the planning and execution of infrastructure projects, leading to greater recognition and professional advancement opportunities. This project underscored the necessity of skilled surveyors in managing complex construction tasks, thereby fostering more specialized training and education programs in surveying.

Broader Implications for Urban Development

12557181685?profile=RESIZE_710xBlueprint for Future Projects:

The Brooklyn Bridge served as a blueprint for subsequent bridge projects not just in the United States but around the world. The effective application of complex surveying techniques demonstrated on this project proved that with thorough preparatory surveying, even the most ambitious architectural endeavors could be realized. Future projects adopted similar surveying strategies, ensuring foundational accuracy from the ground up, which is essential for the safety and longevity of major bridges and other large structures.

Impact on New York City:

The Brooklyn Bridge had a transformative impact on the urban development of New York City. By facilitating easier access between Manhattan and Brooklyn, the bridge encouraged economic growth and cultural exchange, contributing significantly to the integration of city boroughs. This improved connectivity helped to unify the city's economic and cultural landscape, promoting a more cohesive urban development. The bridge itself became a symbol of innovation and resilience, inspiring similar developments that would continue to shape the city's skyline and infrastructure.

The legacy of surveying work on the Brooklyn Bridge extends beyond its immediate impact on the field. It exemplified how precise and innovative surveying is indispensable in overcoming the engineering challenges of major projects. The advancements and professional growth spurred by this project have left a lasting mark on the surveying profession, enhancing its practices and elevating its status within the realm of civil engineering. As we reflect on the Brooklyn Bridge, it stands not only as an icon of New York City but also as a testament to the enduring importance of surveying in shaping our built environments. Through meticulous measurement and creative problem-solving, surveyors continue to play a crucial role in bringing architectural visions to life, ensuring they stand the test of time just as the Brooklyn Bridge has.

The Brooklyn Bridge stands not only as an icon of New York City but also as a testament to the critical role of surveying in civil engineering. From the initial underwater surveys of the East River to the precision required in hanging the massive cables, surveying techniques were integral to every phase of the bridgeโ€™s construction. The projectโ€™s success showcased the possibilities of combining architectural ambition with meticulous surveying, setting a benchmark for future projects and transforming urban landscapes. As we reflect on the achievements of the Brooklyn Bridge, we see a narrative that intertwines the evolution of surveying practices with technological and urban development, highlighting the indelible impact of this field on shaping modern infrastructure.12557185888?profile=RESIZE_710x

Wrapping Up

The Enduring Legacy of Surveying on the Brooklyn Bridge

The Brooklyn Bridge, an emblem of architectural grace and engineering acumen, stands majestically over the East River, serving as a daily reminder of the monumental achievements made possible by pioneering surveying techniques. From its inception, the bridge was not merely a means to connect Manhattan and Brooklyn but a bold declaration of the possibilities within civil engineering when coupled with meticulous surveying.

The journey from conceptual drawings to the final construction of the Brooklyn Bridge involved overcoming numerous challenges, many of which were unprecedented at the time. The precise placement of pneumatic caissons in the unpredictable waters of the East River, the alignment of the massive towers, and the tensioning of the sprawling cables required innovative surveying solutions that pushed the boundaries of existing knowledge and technology. Each phase, from the initial underwater surveys to the precise measurements needed for the cables, underscored the indispensable role of surveying in the bridgeโ€™s construction.

The project's success did more than just span the physical gap between two bustling boroughs; it bridged the gap between traditional surveying practices and the future possibilities of the field. It showcased how architectural vision and engineering expertise could be seamlessly integrated through the art and science of surveying. The Brooklyn Bridge became a benchmark for future engineering projects worldwide, demonstrating that with the right surveying techniques, even the most ambitious projects could be realized.

12557200079?profile=RESIZE_180x180

12557200059?profile=RESIZE_180x180Reflecting on the Brooklyn Bridgeโ€™s construction, we observe a narrative that not only celebrates the evolution of surveying practices but also encapsulates a broader story of technological and

ย urban development. The bridge's impact on New York City was profound, fostering economic growth, enhancing cultural exchanges, and ultimately contributing to the unified development of the cityโ€™s diverse boroughs. This transformation of the urban landscape through such projects highlighted the broader implications of advanced surveying on city planning and infrastructure

ย development.

Today, as we traverse or gaze upon the Brooklyn Bridge, it stands as a testament to the critical role of surveying in shaping our modern infrastructure. Its legacy is not confined to the realms of civil engineering or the borders of New York City but extends globally, influencing new generations of engineers and surveyors. The bridge reminds us of the power of integrating detailed surveying with engineering innovation to turn bold visions into enduring realities.

In conclusion, the Brooklyn Bridge is more than an iconic landmark; it is a symbol of the pivotal role that advanced surveying techniques play in civil engineering. Its story encourages ongoing innovation in surveying, inspiring us to continue pushing the boundaries of what is possible in constructing the complex, beautiful structures that define our built environment. As we look forward, the principles learned from the Brooklyn Bridge will undoubtedly continue to influence and inspire future projects, perpetuating its legacy as a bridge not just between two cities but between the past, present, and future of civil engineering.

10 Takeaways:

  1. Pioneering Surveying Techniques: The Brooklyn Bridge's construction showcased advanced surveying methods essential for managing the complex challenges posed by the East River's unpredictable environment.
  2. Innovative Foundations: The introduction of pneumatic caissons, surveyed and placed with unprecedented precision, was a groundbreaking technique that enabled the stable construction of the bridgeโ€™s towers.
  3. Precision in Instrumentation: The project drove significant advancements in surveying instruments, particularly theodolites and leveling devices, which allowed for greater precision in measurements.
  4. Underwater Surveying: The bridge's construction utilized advanced underwater surveying techniques, including early forms of sonar, to map the riverbed accurately and ensure the caissons were securely founded.
  5. Geometric Accuracy: Surveyors played a crucial role in ensuring the geometric accuracy required for the bridgeโ€™s aesthetic symmetry and structural integrity, using theodolites for precise angular measurements.
  6. Cable Tensioning: Precise surveying was critical in the tensioning of the Brooklyn Bridge's massive steel cables, ensuring even load distribution and structural stability.
  7. Professional Development in Surveying: The challenges faced and overcome during the bridge's construction elevated the professional status of surveyors and underscored their essential role in civil engineering.
  8. Blueprint for Future Projects: The successful application of complex surveying techniques on the Brooklyn Bridge set a new standard for future architectural projects, proving that meticulous preparatory surveying could facilitate ambitious designs.
  9. Impact on Urban Development: The bridge significantly impacted New York City's urban development, enhancing economic growth and cultural exchange between Manhattan and Brooklyn.
  10. Legacy and Inspiration: The Brooklyn Bridge stands as a testament to the importance of surveying in civil engineering, inspiring future generations to continue innovating in the field and pushing the boundaries of what is possible in construction and design.
โ˜…
โ˜…
โ˜…
โ˜…
โ˜…
Votes: 0
E-mail me when people leave their comments –

You need to be a member of Land Surveyors United - Surveying Education Community to add thoughts!

Join Land Surveyors United - Surveying Education Community

Log into community to no longer see ads

Land Surveying Guides

Our Blog Sitemap

 
 

Explore Surveying Locally

USA Surveying Forums
Asia Surveying Forums
Africa Surveying Forums
Middle East Surveying Forums
European Surveying Forums
South American Surveying Forums
Oceania Surveying Forums
Surveying Equipment Support Forums
Search Survey Photos
Add Posts, Surveying Photos, Videos and Articles to the Surveyor Community
Add Stuff to Community

 


 
 
 

 

 

Latest in Surveyor Community

Justin Farrowโ€™s discussion was featured in Continuing Education
Ethics courses, while commonly required as part of the Continuing Education (CE) for Professional Land Surveyors, differ in terms of the specific requirements, the number of hours, and how these courses are integrated into the overall CEโ€ฆ
Wednesday
Justin Farrow favorited Justin Farrow's discussion Exploring How US States Differences for Ethics in Continuing Education in Continuing Education
Wednesday
Fred Flintstone PLS replied to Mary Jo Reiboldt's discussion What is your favorite Survey Nail and why?
"PKย  -ย  PARKER KALONS ...they are the original survey nailย  ...ย  everything else is a cheap knockoff...."
Tuesday
Jaybird published an article
For land surveyors who grew up in an era of beloved, yet now obsolete, surveying software, the idea of running these applications again brings a touch of nostalgia. Thanks to advancements in emulation technology, surveyors can now revive theseโ€ฆ
Nov 10
Thomas McWilliams and Stephan Espindola joined Land Surveyors United - Surveying Education Community
Land Surveyor Land Surveyor
Nov 10
Alliance Land Surveyors updated their profile
Nov 9
Alliance Land Surveyors and Koren Losack joined Land Surveyors United - Surveying Education Community
Land Surveyor Recruiter
Nov 9
Horizons 2024 by DroneDeploy via GeoRadio- All Land Surveyor Podcasts in One

Check out these highlights from this year's awesome event!!!

02:29 - David Fischl, Owner at O'Fischl Inclusion Consulting LTDย 

12:45 - Tyler Stewart, Solutions Manager at Swinerton

21:45 - Daniel Tabar, Co-Founder &โ€ฆ

Nov 8
Moreโ€ฆ