Navigate this panel in order to learn more about this member's contributions to Land Surveying Knowledge. You can view their profile Biography, see their latest posts, surveying photos and videos shared with the community.
My Surveying Life
- 💼
- 👷♂️Bio
- My Posts
- Photos
- Videos
- Stories
- Polls
- Articles
Location
Yanbu
Birthday:
October 1
I am here because I am a...
Surveyor
UserName
Nasir
How long have you been surveying?
18 Years
Current Position
Survey Manager
Your Bio: Please tell other members why you are here:
To utilize creativity, knowledge and excellent interpersonal communication skills in obtaining a carrier with a goal-oriented organization. Seeking to work with a team of professional to develop best environment of Digital Survey and to find my way toward creativity in the world of survey and Mapping. Duties and Responsibilities The operations involved Earthwork, infrastructure and landscaping in the field works are: - Verify the accuracy of survey data, including measure the distance and the angles between specific points on the earth surface. Determine longitudes and latitudes of important features and boundaries in survey areas, using theodolites, transits, levels, and satellite-based global positioning systems (GPS). Coordinate findings with the work of engineering and architectural personnel, clients, and others concerned with projects. Initial establishment of benchmarks and all the stations as the reference. Based on these operations the horizontal and the vertical control is established. Carrying out topographic surveying. This is the surveying of contour of the given land which involves both vertical and horizontal controls. For the constructions works related to buildings, culverts, sewers, bridges, and water supply schemes the lines must set out and the grades are established by the surveyors. Drafting, computing, and designing are the office works that must be performed by the surveyor. The drafting performed consists of the preparation of plans and the sections. These must be plotted to the measurement and to scale and prepare the topographic maps. The computing process is done in two cases. Initially, it can be done for the plotting. Secondly, it can be constructed for the determination of the areas and the volumes. Review information from survey teams regarding measurement of distances, directions, angles between points and elevation of points, lines, and contours on, above, and below the earth’s surface. Research legal records look for evidence of previous boundaries and analyse the data to determine the location of boundary lines. Record the results of surveys and verify accuracy of data. Calculate the quantities of excavation and filling. Make a network of triangulations for project plots. Experience working in infrastructure and construction a requirement. Understand scopes of work and project requirements. QA/QC process on survey deliverables. Prepare Survey report. Ability to communicate technical information effectively. Ability to perform detailed field and office surveying work. Calculate heights, depths, relative positions, property lines, and other characteristics of terrain Have strong knowledge of AutoCAD and civil 3D. Computer literate This is possible through the adoption of some of the best processes and technologies in the industry, meeting tight schedules on the most challenging projects.
I have experience with the following
GPS, topographic, boundary surveys, construction staking, topographic surveys, control network surveys, ground movement monitoring, GIS, Construction, Machine Control, Other, I Teach Surveying, GPR
+ Add Evidence & Experience
- 👷♂️
- + Term
- 📸
- 🖥️
- 💬
- 📃
Contribute your knowledge and expertise in Land Surveying to the community and help us excite the next generation of Land Surveyors! In this panel you can quickly post to any area of the community.
Circumferentor (aka "Surveyor's Compass)
Levels and Levelling in Surveying: A Comprehensive Guide
Texas Court of Appeals Case
Solar Observations
Introduce
Altus NR3
When the Canvas Fights Back: An Introduction to Hard-Way Learned – Terrestrial Friction
The Cartesian Bargain: Survival Protocols for Your First Day in the Geodetic Trenches
Behold- A Flat Earth Map
Never Stop Surveying: 5 GNSS Post-Processing Alternatives to OPUS Downtime
Harmonizing Discrepancies: US Land Surveying Laws & Guidelines Compared
Top 7 AI-Powered Tools Land Surveyors Can't Afford to Ignore in the Next Decade
First Day Fails: 7 Land Surveying Mistakes Newbies Must Avoid
Futurists and Legacy
- 🧠
- Latest Activity
- Ambassadors
- Continuing Education
Earned points: 281
May 8, 2019
Jul 3, 2021
Jul 3, 2021
Leave a Message
You need to be a member of Land Surveyors United - Surveying Education Community to add thoughts!
Comments are closed.
Thoughts
hi