My Community

Location

bihar


Birthday:

May 22


I am here because I am a...

Surveyor


Please tell other members why you are here:

VIKAS KUMAR Passport No. : Mā€“ 3896633 valid upto 2024 Date of Issue : 02/12/2014 Place of Issue : Patna Contract No : +91-9587409120, +91-9470461327 Email : [email protected] [email protected] Job Objective : To join a tremendously growing company, where my analytical approach can be utilized to benefit the organization and provide me a platform to upgrade and improving my knowledge and ability. Professional Experience: An dynamic leader with over 18 years 7 months of experience in various field of surveying and Auto Cad, Infrastructures project like pipe line, utilities Road, Tunnel, Deep Excavation work like Topographical Survey, City Survey, Construction of Major Bridge, buildings and Highway. I am conversant with specification of Ministry of Road Transport and Highway ,IRC of contract & Methodology of Construction Supervision of World Bank funded & BOT project, as I have been associated with such Major Bridge, Flyovers, Toll Plaza building, Commercial Building, Residential building and Highwayā€™s projects . I have executed in surveying various types of foundations (Well, Piles and Raft) substructure and superstructure (I, T- Section .Girder, Trapezoidal and rectangular girder) & Reinforced Earth Wall. I have executed in surveying Highway projects works likes as establish of Global Positioning System (GPS) & traversing of control points and Bench marks also various layers of roads crust like Embankment, Sub grade, G.S.B, W.M.M, D.B.M, B.C & D.L.C, P.Q.C. and monitoring of physical verification of land acquisition, co-ordination with client, Govt. authority & administration, upcoming obstruction issues trees, utility shifting, lands & structure obstruction as project Surveyor and as team member of construction supervision. Having good knowledge of Auto Cad Software and latest Survey Equipmentā€™s and Technology I am delivering my technical expertise in various reputed Organization. ļƒ˜ ABROAD : 2 years 3 months ļƒ˜ INDIA : 16 years 4 months ļ± Total Years of Experience : 18 years 7 months ļ± Current Industry : Construction /Infrastructure ļ± Current Functional Area : Road & Highway Project(NH-12) ļ± Current Sub Functional Area : Surveying ļ± Current Location : Bundi (Rajasthan) ļ± Location Preference : Anywhere Specialization in following Instrument:- ļƒž Global Positioning System (GPS) a) Trimble 5700, 5800 Total Station :- ļ± Nikon DTM 522 ļ± Sokkia Set 500,Set 1 030 R, ļ± Leica (TC) R 307 & TPS 1200,1201,TS 06 ļ± Topcon GTS ā€“210 & 702, All type of advance level instrument Education /Technical Profile: ļ± Government Industrial Training Institute in Surveyor with 89% marks from Muzaffarpur 1999 ļ± Intermediate in Science with 57 % marks from B.I.E.C. Patna ļ± Distance learning Graduate Diploma in Civil Engineering with ā€œAā€ Grade from Maharashtra 2006 Vikas CV 2 of 4 Computer Knowledge : ļƒ˜ AutoCAD 2000 & including latest software 2D Dimensional Drafting 3D Modeling ļƒ˜ Auto Plotter Road Estimator 6.X ļƒ˜ MX ROAD v8i Select Series2 ļƒ˜ ESurvey CADD & ESurvey Civil Tools ļƒ˜ MS-Office Project Activities in Various :- ļ± Review analyses works methods and research / examine previous survey evidence, maps deeds physical evidence, and other records to obtain data needed for surveys. ļ± Plan coordinate and direct works of management engaged in surveying lands surface to determine precise location and measurements of points, elevation, line, area and outline of areas of construction and to establish and traversing of control points and Bench marks. ļ± Templates for coordinate transformation from wgs84 to local grids and vice versa preparation of geodetic datum transformation. ļ± Execution and supervision of the survey Works such as Fixing the alignment of center line Road, Tunnel profiling , pipeline, underground utilities, bridge, Reference Pillars and to Layout Various items of road works like various Layers of Crust and different activities of Structure like Bridges, Flyovers and Culverts with Advanced Total Station. Taking of Original ground levels, Checking of TBM, Center Line (Horizontal and vertical of the principal survey Points) Preparation of, X-section, L- section, Level Sheet from given Plan and profile and also as per drawing Technical specification. ļ± Infrastructure & Road Project of underground utilities works District cooling, Sewerage, Storm water, Water Supply, Irrigation, Polished Water Treated Sewerage Effluent Line, Telecom, Low Voltage & High Voltage 11kv, LPG Gas Line, Street Light Network, Level and center line marking. ļ± Execution and supervision of the alignment of all various component of Bridges, flyovers, minor bridges as foundation (open, pile type), substructure (rectangular, circular, trapezoidal types of piers). ļ± To execute and supervision the alignment of the various component of major bridge, flyovers in Super Structure (R.C.C girder, void slab, Deck, Crass-barrier, footpath, MS railing) & Super Structure i.e. Bearing (POT cum PTFE, Elastomeric) as per MORTH specification. ļ± Leading surveying department in preparing team, agendas, surveying coordination, drawing for layout, controlling the use of survey equipment. Monitoring the survey expenditure. ļ± Responsible for day to day site activities by planning, scheduling, organizing, monitoring all construction activities. ļ± Responsibility includes, Planning and Execution of Road work activity likes Formation, embankment foundation, Lower Sub-Grade, Cement treated upper Sub-Grade, Granular Sub-base, and Cement stabilized upper Sub-base, Wet Mix Macadam, DBM, Bituminous Concrete and Kerbs, Medians, Drains, CD works. ļ± Collection of dataā€™s and preparation of project as built drawing as per the project specification and client requirements, Preparation of Earth work cross section drawings, Checking of as built drawing with client representative and getting approval for the same. Monitoring site progress and approve payment certificates to enable payment to consultant and contractors including final handover certificates and to estimate Final Value of a Project based on information. To visit construction site as often as possible to ensure all scope deviations/changes are identified and accounted for. Evaluation of claims and variations. ļ± Co-ordinate with Consultant, client, contractor etc. to prepare the Joint Measurement Record, Weekly & Monthly Progress Report. ļ± All works to the entire satisfaction of my senior management in accordance with applicable Company procedures. Vikas CV 3 of 4 Details of Experience :- ļ± Name of Employer : G.V.K. Project and Technical Services Limited (Hyderabad) Post Held : Senior Surveyor In Various Project January 2011 to Till Date Project : Four Laning of Deoli-Kota Section of NH-12 from km 165.000 To Junction of NH-76 on Kota Bypass (Approx Length of 83.04 Km) in the state of Rajasthan on BOT (Toll) Project on DBFOT Pattern under NHDP Phase III Structure 1 : Four laning of Road section of NH-12 for the length of 83.00 km Up to junction of NH-76 Structure 2 : Twin Traffic Tunnel of 2.154 km length and 14.5m wide each. Client : National Highway Authority of India Concessionaire : G.V.K. Deoli-Kota Express Way Private Limited EPC Contractor : G.V.K. Project and Technical Services Limited Consultant : Scott Wilson India Private Limited ļ± Name of Employer : Louis Berger Consulting Pvt. Ltd. (Gurgaon) (Project Management Consultant) Post Held : Survey Engineer In Various Project January 2010 to January 2011 Project : 6-Laning of Gurgaon ā€“Kothputli-Jaipur section of NH-8 From Km. 42.70 to Km. 273.00 (Length 225.60Km) in the State of Haryana and Rajasthan to be executed as BOT (TOLL) on DBFO Pattern under NHDP Phase -V Client : National Highway Authority of India Concessionaire : Pink City Expressway Private Ltd. ETA&KMCā€JVā€ Contractor : Unity Infraprojects Limited from Km. 144+770 to Km. 181+300 (Package-IV) ļ± Name of Employer : BSC-C&C Construction limited ā€œJVā€ (Gurgaon) Post Held : Survey Engineer In Various Project November 2008 to January 2010 Project : Arariya to Bhaptiyahi Road (SH-76 Length 121 Km) And Kursela to Farbisgunj (SH-77 Length 105 Km) State highway Project Client : Road Construction Department (Govt. of Bihar) Consultant : Intercontinental consultant &Tenhnogats Pvt. Ltd. (New Delhi) JV with Planning & infrastructure Development Consultant. ļ± Name of Employer : Dodsal Pte Limited (Singapore) Post Held : Surveyor In Various Project August 2006 to October 2008 Project : Jumeirah Village South III (Infrastructure & Road Project) Dubai (United Arab Emirates) Client : Nakheel Consultant : Mouchel Parkmen Project Management : EllisDon ļ± Name of Employer : Maytas Infra Private Limited (Hyderabad) Post Held : Surveyor In Various Project October 2005 to July 2006 Project : Construction of six lane outer ring road Connecting Mysore road to Magadi road (Chainage from 51.880 KM to 56.700 KM) Client : Bangalore Development Authority Consultant : STUP Consultants Private Limited Project : Bangalore Elevated Road Project (NH ā€“ 7) Client : National Highway Authority of India ļ± Name of Employer : Dodsal Private Limited (Mumbai), India Post Held : Surveyor In Various Project December 2003 to September 2005 Project : Surat Manor Tollway Project (NH ā€“ 8) (Chainage from 263.400 KM to 343.130 KM) Client : National Highway Authority of India Vikas CV 4 of 4 Consultant : BCEOM with Joint Venture of Consulting Engineering Services (India) Ltd. ļ± Name of Employer : Integrated Techno System Private Limited (New Delhi) Post Held : Surveyor In Various Project January 2002 to December 2003 Project : Topographical Survey for Dam Complex Area (Lower Subansiri Project) in Gerukhamukh (Dhemaji) Client : National Hydroelectric Power Corporation Limited Consultant : National Hydroelectric Power Corporation Limited Project : Infrastructure Development of Bawana Industrial Area Client : Delhi State Industrial Development Corporation Consultant : Delhi State Industrial Development Corporation Project : Topographical Survey work for 1100MW Power House Area at (Pakkal- Dul Project) in Kishtwar Dist. Doda (Jamu&Kashmir) Client : National Hydroelectric Power Corporation Limited Consultant : National Hydroelectric Power Corporation Limited ļ± Name of Employer : Chadha Project Service (Noida) Post Held : Surveyor In Various Project September 2000 to December 2001 Project : GIs for basic Telephony Services in Punjab State Client : HFCL Consultant : Inca Informatics Ltd. Project : Topographical Survey for Lucknow Bypass (NH 25 to NH 28) Client : NHAI (National Highways Authorities of India) Consultant : Sir Owens Williams Consultancy & Engineering Services Ltd. Project : Topographical Survey for Design of Strom Water Drainage in Gangtok Client : Government of Sikkim Consultant : WAPCOS ļ± Name of Employer : Usha Amanat Tracing Training Institute (Muzaffarpur ,Bihar) Period : From August 1999 to September 2000 Post Held : Surveyor Instructor Personnel Profile: Fatherā€™s Name : Shri Ram Sunder Bhagat Date of Birth : 2nd June 1979 Nationality : Indian Sex : Male Martial Status : Married Language Know : Hindi, English Religion : Hindu Permanent Address : Shri Ram Sunder Bhagat Mol.-Bairiya (East Of Danav Pokher) Near Housing Board Colony Chowk Post- Kolhua Paigamberpur Dist- Muzaffarpur Bihar-843108 Expected Salary : Negotiable CERTIFICATION I, the undersigned, certify that to best of my knowledge and belief, this CV correctly describes my qualification, my experience and me. Date: _ _ / _ _/ _ _ (Vikas Kumar


I have experience with the following

GPS, topographic


My Background in Surveying


Earned points: 270
First Post
Received:
Mar 21, 2019
10
Story Teller
Received:
Mar 21, 2019
100
First Photo
Received:
Jul 3, 2021
30
Social Surveyor

800
Ambassador

4203
GeoMentor

10035
Party Chief

Special
Survey Legend

Special

Share Your Survey Experience

Check out all of the latest posts from land surveyors around the world.