Hi There,

I'm getting my hands on a Topcon GT-1002 TS soon but the manual says nothing on setting out points in reference to a given line.

As a Leica user I am used to defining a line by two points of the memory and setting out points in an offset to that line (i.e. setting out grid lines in construction work with 1m offset).

I can't set out the points in the field as these points might be infinitely far away.

Any ideas how this works on a GT-1002 series?

Thanks,

a.

This Content Originally Published by a land surveyor to Land Surveyors United Network

Views: 103

See Your Saved Posts Timeline

Where Thousands of Professional Land Surveyors, Students of Surveying and Educators are United through Collaborative Knowledge and Purpose.

Tools,Apps and Quick Guides

BMC logoSupport Us! +LandSurveyorsUnitedon Google+

Next Generation Land Surveyor Community Where Every Day is a Surveying Conference

© 2018   © Created by Land Surveyors United   Powered by

Badges  |  Contact LSU  |  Privacy Policy  |  Terms of Service