Dear Topcon users, Can someone help me with the following TopSurv issue?
We use TopSurv for data collection and Topcon Link to save the Topsurv job to an Autocad job. When I save the .tsj job in an dwg I get the text of the elevation of a point in three digit ( 12.345) , but I need the the text in two digit (12.34).
How can I change this.
Monty K***
Find Similar Content by Clicking These Tags ☟
Subject Tags: Topsurv
Pass This On Tweet This
This Content Originally Published to Land Surveyors United Network
Views: 195

Permalink Reply by Surveying Jobber on January 29, 2013 at 12:15pm I for one have limited knowledge of Topsurv, but if you ask this question as a discussion inside the Topcon Support Group you are bound to get targeted advice from Topcon users specifically

Permalink Reply by Surveying Jobber on January 29, 2013 at 12:17pm 
Permalink Reply by Surveying Jobber on January 29, 2013 at 12:20pm Topsurv Manual
The largest geospatial network on planet earth, covering all land surveying related topics! Share surveyor knowledge with media in forums.

Take this Page With You
QR Code for This Page: What is this?
Follow Our Progress
Share and Learn new surveying techniques and tips in this Social Surveying Education Experiment and learn what it takes to be a Level 10 Land Surveyor.
June 21st-June 19th 2013
Read More
How it Works
© 2013 © Created by Land Surveyors United
Disclaimer: our moderators do not verify the accuracy of your postings and assume no responsibility for the contents therein.
