International Land Surveyors Week 2018 Info

Is your country or state not listed? let us know or check in here

Check In #ISW18

Dear Fellow Surveyors.

I work in a supervision consultation Engineering company and I have been recently deployed in a road project which is in the closing phases.

my previous experience was in the building construction mainly, I have adapted well through the last 8 months here.

now I have received the first As Built Transmittal for plan and profile.

what is the best way and method to fulfill this task?

a walk through explanation would be great.

Thanks in advance20180129_140357.jpg20180129_140412.jpg

This Content Originally Published by a land surveyor to Land Surveyors United Network

Views: 300

See Your Saved Posts Timeline

☇ Reply to this

Replies to This Discussion

A full topographic map of the changes with all the utilities shown in plan view on the map and profile view on its own sheet. Pay extra care to wheelchair ramp elevations. They should have a list of requirements for their as-built needs
They'll want contours and lane striping on the road through the back of sidewalks or edge of right-of-way

Dear Friend,

Though your role is not clear, As per my understanding you may be required to certify this document about its correctness with the construction of the highway. In that case, you need to check the following.

1. Finished road levels match with the field levels(Some tolerance is permitted as per you country guidelines, In India it is 3mm plus or minus). you can randomly check the levels in the field with the given drawing. You may require the help of construction surveyor to identify the correct chainage and location of the point.

2.Check all the features as shown in the drawing are really erected at the site. For example a lamp post or a sign board or any thing else.

3. Check the correctness of the horizontal curves and vertical curves.

In case of Interchanges check whether all the components as shown is literally present.

                                         This list can go long, however understand that basically the drawing features are really as per the ground.

Thank you.

Regards

A Murali babu

You can use the archive of all  final check data -for approval purposes- that accumulated during construction phases and carry out field surveys to add features which were not documented in your records.

A full record of plan-profile drawing (superimposed on contours), cross section drawings and other required records can be generated after compilation of all the as-made representative data.

RSS

Where Thousands of Professional Land Surveyors, Students of Surveying and Educators are United through Collaborative Knowledge and Purpose.

Tools,Apps and Quick Guides

Surveyor Community Hubs For World Regions

Surveying Hubs For US States

Social Support For Equipment

Surveying Photos by Tag

Surveying Videos by Tag

BMC logoSupport Us! +LandSurveyorsUnitedon Google+

Next Generation Land Surveyor Community Where Every Day is a Surveying Conference

© 2018   © Created by Land Surveyors United   Powered by

Badges  |  Contact LSU  |  Privacy Policy  |  Terms of Service